All shot blasting machines must follow the following guidelines during installation:
1. Host positioning: When the host is in position, its levelness and weight must meet the requirements of the drawing.
2. The installation of individual components should be carried out from bottom to top.
3. Track type, suspension chain type, and roller type should be from the inside to the outside of the equipment.
4. During the test run, partial pre testing should be carried out first, and then full operation should be carried out after normal operation.